&&
  • Home
  • About us
  • Certificate
  • Products
  • Cases
  • Cooperation
  • Contact us
  • Media Contact
wear resistant coatings > BD7053 desulfurization pipeline wear resistant coatings

BD7053 desulfurization pipeline wear resistant coatings

BD7053 desulfurization pipeline wear resistant coatings
product description of BD7053  desulfurization absorption tower and slurry pipeline special anti corrosion abrasion resistant coating:
The BD7053 absorption tower,slurry pipeline special abrasion resistant coating is the high performance 
high temperature resistant, wear & corrosion resistant polymeric ceramic material compounded by high
performance wear resistant,corrosion resistant materials and modified toughening heat resistant resin.
It’s the abrasion resistant coating of special using in desulfurization absorption tower and slurry circulation pipeline.
 
product features:
1.With excellent wear & corrosion resistant performance                            
2.With very high bonding strength to metal,resin type substrates
3.Don't drip and slip,the construction is convenient       
4.suitable for the protection of high temperature erosive wear,corrosion working condition
5.hot water resistant,steam resistant,acid resistant,alkali resistant               
6.with good toughness,don’t crack
 
Product index:
product name physics status operation
 time limit
(25¡æ)
curing time
(25¡æ)
range of application
BD7053 absorption tower and slurry pipeline
 special wear resistant coating
paste 40min 24h Special used in the preparation and repairing of 
wear resistant coatings of 
desulfurization absorption tower and 
slurry circulation pipeline.
 
color density
(g/cm3)
compressive
 strength
(Mpa)
GB1041-2008
tensile strength
(Mpa)
GB6329-2008
shear strength
(Mpa)
GB7124-2008
bending strength
(Mpa)
GB1042-1999
hardness after curing
£¨Shore D£©
ASTM-D-2556
working
 temperature
£¨¡æ£©
gray 2.22 112 38 11 56 89 -60¡«150
 
How to use:
1.Surface treatment: Do coarsening treatment on the pending-  repair area, grinding with angle grinder or sand blasting and so on, the surface after coarsening treatment should be
 cleaned,the surface after this treatment should be the one coarsening,dry and fresh substrates,should be no greasy
 dirt and dust.
 
 2.Preparation:According to the weight ratio 4:1, make A and B two components of BD7053 absorption tower  and slurry pipeline special abrasion resistant coatings mix uniformly,and use it up within 40 min.Generally it’s while
 construction and configuration.Every time the most configuration quantity is not more than 2Kg, too much adhesive 
 is solidified too fast,hasn’t been used up until partial adhesive has solidified and can’t be used. According to the 
 actual temperature,configuration can be appropriately a little more in winter,proper less in summer.If the temperature
 is too low,you can properly heat up the A component to reduce viscosity for easy to configure.
 
3.Coating: The suitable coating thickness of BD7053 absorption tower,slurry pipeline special wear resistant coating is
 2~8mm.Make the mixed-up material spread coating on the pending repair area layer by layer,the adhesive layers should
 be compacted,make it infiltrate fully with the substrates.Repair the surface to be smooth after the coating is coated in the 
 suitable size.This material can’t do machining,so you should pay attention to controlling the coating thickness to avoid 
 appearing interference phenomenon in the assembly
.
4.Curing: It can put into using to cure for 24 hours at the temperature of 25¡æ.When the temperature is below 15¡æ,
 the coatings can’t cure completely,should heat it up to the temperature of 80¡æ and keep this temperature for 2 hours
 to promote the coatings fully curing after the coating initial curing
 (can use the iodine tungsten lamp to do irradiation heating with 40cm distance from the coating.)
 
Packaging specification:
20Kg/group, packed in a plastic drum, A component: 16Kg/drum, B component: 4Kg/drum
 
Transportation and storage:
1.Sealed storage in the cool and dry place. The warranty period is 1 year.
2.Avoid placing it upside down,knocking against and transporting it as a non-dangerous product during transportation.

Product packaging actual photo of BD7053 desulfuration pipeline anti chemical wear corrosion resistant repair epoxy coating:


 
 
                                       
                                      
 
                                                                  
                                                                  
                                   
------·Ö¸ôÏß----------------------------
abrasion wear
resistant coating
crusher backing
compound
anti corrosion
resistant coating
slurry pump
repair coating
industrial ceramic
epoxy adhesive
rubber liquid
coating
thermal heat
insulation coating
skid resistant
coating
heat conduction
coating
thermal conductive
adhesive
high temperature
resistant adhesive
high strength
structural adhesive
industrial repair
agent
rubber metal
bonding adhesive
elastic flexible
adhesive
high temperature
anti seizure compound
high temperature seize
resistant agent
bearing anti wear
fastening adhesive

CEO Email: jimmy@realbond.net        Tel:86-0710-3122805        Fax:86-0710-3618337